2*2" wood is screwed to the inside lower edges of the beams
padstones beneath the beams
The spare beam from the original lean-to roof is re-used across the front bedroom doorways to make a firmer footing for the beams which will support the floor joists
Beam across east gable wall is joined over corridor
Washroom floor is prepared for first pour concrete
New doorway steps to cope with change in level from back to front of the building
.....these were the door headstones to the original back doorway, which were originally old gate posts....we like the continuing cycle of re-use...
the floor joists arrived....
On Thursday, concrete lorry arrives again for wash room and drying room floors.....
shiny new barrow...
Teamwork.....
and then into the drying room....
Last load...
two metal re-inforcement grids go in..
tamping down
rendering remaining bedroom walls continues....
and more blocks for the washroom divisions arrive....hopefully the last load of these
dry washroom floor
Barn door beam swapped over to minimise the distance moved from the
original location