Week 8 concentrates on the washroom re-build and storm drains.
Digging storm drain route to go across driveway to the existing drains
A cold and frosty start to Day 37 with sunshine on Whernside ridge - a perfect day
Double skin walling with insulation pegged to inner wall
Thank you Toddy, for continuing the photographic record to Day 37
supports going in for removal of old headstones and wooden lintels - unfortunately current building regs require concrete lintels that extend further over widened door openings, so the old door heads cannot be re-used.....:(
Down below, more supports in preparation for the door head stone removal, which will be tricky and will wait until the start of next week
......distracted with the first winter flurry of sleety snow mid-afternoon
by the end of Week 8, side wall is up to 2m, ready for front walling next week
& finally, as temperatures fall in clear skies, moonrise to the north of Ribblehead Viaduct